ワインディングマシン

Delivery of the second winding machine and
This is a repair report on a wine dosing machine delivered 14.5 years ago.

May 2004 1st winding machine

A customer to whom we delivered a winding machine that can rotate four bottles in May 2004.
Fourteen and a half years have passed since the delivery of that first unit.
An additional delivery of a second 4-turn winding machine in December 2018.

The leather used is K001, a special grade of French pastured lamb!
You may have noticed that the interior and exterior have been upgraded compared to the first car.

ワインディングマシン


ワインディングマシン



That means that a total of eight watches are wound. 
Thank you very much. 
We hope to have the same long-lasting relationship with you as we did with the first car. 

Then, immediately after the delivery of the second unit
The first winding machine.
Gear replacement and inspection has been accepted.

The first winding machine is
Delivered in May 2004.
  ↓arrow (mark or symbol)
  ↓arrow (mark or symbol)
  ↓arrow (mark or symbol)
  ↓arrow (mark or symbol)
About seven years later ,
March 2011: Motor gear replaced.
  ↓arrow (mark or symbol)
  ↓arrow (mark or symbol)
  ↓arrow (mark or symbol)
  ↓arrow (mark or symbol) 
About seven years later,
December 2018 motor gear replacement.

This is the maintenance history of the company.

ワインディングマシン メンテナンス
Winding Machine Maintenance

The motor gear is replaced roughly every 7 years.


As for the winding machines produced by Soulbird
I think this is an average maintenance timing.

Thank you very much for taking good care of them.


Every time the winding machine is serviced
It makes me feel, "How could they have built such a complex machine?"

Not to be magnetized.

Protection circuit in case of electrical leakage.

To be able to use it anywhere in the world.

No load on the watch that can be used.

The winding machine must be beautiful.

The main body of the winding machine must not be consumable.

Easy maintenance.

The size of the product must be small enough to be easily sent for maintenance.

Cases that do not deteriorate even after decades, etc. ........


I remember considering many things.

The winding machine that resulted from this process is
We are grateful for the longevity of the owners.

We hope to have a long-lasting relationship with you.

We immediately delivered the motor gear to the customer who replaced it.


★ Maintenance cost ★

Maintenance costs are also available here.

The cost of replacing the motor gear is
The price is ¥13,600 per unit (tax included) (as of December 2018).
After the winding machine arrives in Ikebukuro,
We will work on it immediately and re-deliver it in 1-3 days.
Maintenance is also not outsourced, but by Seoul Bird.
We are able to deliver in a short period of time because we do all the work.

For Soulbird winding machines ,
It is safe to assume that the only maintenance cost required is the cost of this motor gear replacement.
No other repair costs will be incurred unless it is something very serious.

We can also provide other services such as interior leather renewal.
Upgrade your current winding machine,
If you wish to remodel, please let us know.

Postscript:
We often receive inquiries about how to select a winding machine, so we will provide more specific information at a later date.